Wednesday, December 06, 2006

Dec 6th - Plumbing Rough-in Complete





Today I've finished running all the water lines to their location from the manifold. Pat has helped me in the crawl space pull pipe into the old cabin. I've also completed the drain lines on the 3rd floor while Greenbay works on the framing for the 3rd floor loft. Pat has been working on finish framing in the master trying to prepare it for drywall as soon as the electrical and insulation are complete.

Hagen is coming along on the fireplace and tonight I have to take the glass blocks home and clean them up for tomorrow's installation. The stone he has used looks great and by tomorrow it should be close to being finished. Only the installation of the mantle remains on the fireplace. Mike has even lit a fire and it draws perfectly.

Chris has come by to take a look at installing the entire heating system. I hope to have the bid this week.

Pat and I stay late tonight cleaning up and trying to organize some. It's amazing how quickly I can make a mess...I think Lynn will agree.