Saturday, November 18, 2006

Nov 17th - Skylights



The skylights have arrived today and Pat and Greenbay hoist them onto the roof. Pat continues to apply steel and build all the flashings around the skylight. It's a tedious process that requires attention to detail to make sure that the skylights on the metal roof don't leak.

Bill has been completing the framing for the floor system and installing the TJIs upstairs over the 2nd floor. The framing is coming together nicely. Bill and I have moved several piles of lumber to get access to the pink foam I will need to finish insulating the concrete wall and the outer logs around the foundation. We have restacked much of the lumber both out front and out back so we will have better access.

I have been up in the master preparing the flashing and framing for the windows. Greenbay and I spend the afternoon getting the the 3 south windows installed.